{"id":6618,"date":"2020-01-14T11:49:59","date_gmt":"2020-01-14T11:49:59","guid":{"rendered":"http:\/\/www.srbatom.gov.rs\/srbatomm\/eu-projekti\/"},"modified":"2021-08-18T07:32:00","modified_gmt":"2021-08-18T07:32:00","slug":"eu-projekti","status":"publish","type":"post","link":"https:\/\/www.srbatom.gov.rs\/srbatomm\/eu-projekti\/?lang=en","title":{"rendered":"EU Projects"},"content":{"rendered":"\n<h4 class=\"has-text-align-center wp-block-heading\">Policy and Legal Advice Centre (PLAC II)<\/h4>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"200\" height=\"67\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/Plac-II-1.jpg\" alt=\"\" class=\"wp-image-6010\"\/><\/figure><\/div>\n\n\n\n<p>Through the project <strong>Policy and Legal\nAdvice Centre<\/strong> <strong>(PLAC II),<\/strong>&nbsp;the European Union supports\nand assists Serbia in improving concordance between the national legislation\nand the EU acquis, as well as the implementation of legal acts, and enhancing capacities of relevant institutions to successfully\ncarry out accession negotiations. The main beneficiaries are the Ministry of European Integration and the Negotiating Team for Accession of the Republic of\nSerbia to the European Union. Other beneficiaries are ministries and\ninstitutions responsible for the harmonising legislation in specific areas.<\/p>\n\n\n\n<p>Within <strong>Chapter 15 \u2013 Energy<\/strong>, 9 project activities were implemented in the period between June 2016 and December 2018 whose beneficiary was Serbian Radiation Protection and Nuclear Safety Agency, either independently or together with other ministries.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><\/td><td> ToR <\/td><td> PDF <\/td><\/tr><tr><td>1.<\/td><td><strong>Guidance for authorization  process  for radiation practices in nuclear  medicine and radiotherapy<\/strong><\/td><td> <a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><a rel=\"noreferrer noopener\" href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-1.pdf\" target=\"_blank\"><\/a>  <a rel=\"noreferrer noopener\" href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-1.pdf\" target=\"_blank\"><\/a> <\/td><td><a rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\" href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-1-A5-eng.pdf\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>2.<\/td><td><strong>Guidance for the process of <br> licencing of radiation  practices in industrial radiography<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-2.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-2-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>3.<\/td><td><strong>Guidance for safety assessment in zero power nuclear reactors<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-3.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-3-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>4.<\/td><td><strong>Guidance for  Inspection plan for nuclear facilities  except nuclear power plants<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-4.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-4-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>5.<\/td><td><strong>Rulebook on Security of Radioactive Sources<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-5-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-5-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>6.<\/td><td><strong>Guidance for Inspection Programme  for different radiation practices<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-6.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-6-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>7.<\/td><td><strong>Metodology of establishing dose constraints  and Guidance for high-activity  sealed radiation sources management<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-7.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-7-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>8.<\/td><td><strong>Guidance for etsablishing graded approach to regulatory control<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-8.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-8-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>9.<\/td><td><strong>Preparation of documentation\/instructions<br>  for  key regultaory body procedures and development of guidance for licencees<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-PLAC-II-Success-Story-9.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-II-Success-Story-9-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><!--StartFragment--><\/p>\n\n\n<h4 class=\"has-text-align-center wp-block-heading\"><strong>Policy and Legal Advice Centre (PLAC III)<figure><a rel=\"noopener noreferrer\" href=\"http:\/\/euinfo.rs\/plac3\/o-projektu\/\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"136\" height=\"91\" class=\"wp-image-6107 alignright\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/plac-default-img-400x267-1.jpg\" alt=\"\"><\/a><\/figure><\/strong><\/h4>\n\n\n\n<p><\/p>\n\n\n<p><!--EndFragment--><\/p>\n<p>The <strong>PLAC III<\/strong>&nbsp;project provides for legal assistance to the Government of the Republic of Serbia in the process of harmonisation of the national legislation with the EU&nbsp;<em>acquis<\/em>&nbsp;through amending the existing and drafting new legislation and assisting in the process of accession negotiations with the European Union. Assistance during the negotiation process will be provided through workshops and training courses organized within the framework of the project.&nbsp;<strong>The main aim <\/strong>of the PLAC III project is to achieve a high level of effective alignment of national legislation with the EU&nbsp;<em>acquis<\/em>&nbsp;and its implementation.<\/p>\n<p>Within <strong>Chapter 15 \u2013 Energy<\/strong> it is planned to implement 7 project activities in the period between January 2019 and July 2021 whose main beneficiary is Serbian Radiation and Nuclear Safety and Security Directorate in cooperation with other ministries and institutions.<\/p>\n<p><\/p>\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><\/td><td>  ToR  <\/td><td>  PDF  <\/td><\/tr><tr><td>1.<\/td><td><strong>Guidance for management of disused radiation sources in radiation practices<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/ToR-Plac-III-Success-Story-1.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-Plac-III-Success-Story-1-A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>2.<\/td><td><strong>Drafting guidance on criteria for recognition of Medical Physics Experts (MPE)<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/06\/ToR_PLAC-III_Ch-15_Medical-application_radiation-protection_EUD.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/07\/SRBATOM-Plac-III-Success-Story-2A5-MPE-eng-.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>3.<\/td><td><strong>Drafting guidance for accidental and unintended exposure<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/06\/ToR_PLAC-III_Ch-15_Medical-application_radiation-protection_EUD.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/07\/SRBATOM-Plac-III-Success-Story-3A5-eng-.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>4.<\/td><td><strong>Drafting Methodology for estimation of population doses<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/06\/ToR_PLAC-III_Ch-15_Medical-application_radiation-protection_EUD.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/07\/SRBATOM-Plac-III-Success-Story-4A5-eng-.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>5.<\/td><td><strong>Guidancce for establishing Quality Assurance Programmes<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/06\/ToR_PLAC-III_Ch-15_Medical-application_radiation-protection_EUD.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/07\/SRBATOM-Plac-III-Success-Story-5A5-eng-.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>6.<\/td><td><strong>Justification of practices and justification of non-medical imaging exposure<\/strong><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/08\/ToR_PLAC-III_Ch-15_Medical-application_radiation-protection_EUD.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2021\/08\/SRBATOM-Plac-III-Success-Story-6A5-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h4><strong>TAIEX<\/strong> &#8211; Technical Assistance Information Exchange Office<a href=\"https:\/\/ec.europa.eu\/neighbourhood-enlargement\/tenders\/taiex_en\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-6803 size-full\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/Taiex.jpg\" alt=\"\" width=\"254\" height=\"163\"><\/a><\/h4>\n\n\n<p><\/p>\n\n\n\n<p><strong>TAIEX<\/strong> &#8211; Technical Assistance Information Exchange Office is an instrument of the European Commission with an aim to provide short-term assistance to new European Union member states, countries that are candidates for EU membership and countries of the Western Balkans concerning the harmonization of national regulations with <em>acquis communautaire<\/em>, as well as their implementation.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>1.<\/td><td>Estimation of Radiation doses to the Members of the Public<\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-TAIEX-Success-Story-1-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>2.<\/td><td>Regulatory Control of practices involving NORM<\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/03\/SRBATOM-TAIEX-Success-Story-2-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><tr><td>3.<\/td><td>Reference levels and dose assessment<br> in emergency and existing exposure<br> situations<\/td><td><a href=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/10\/SRBATOM-TAIEX-Success-Story-3-eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"\ufffc (\u043e\u0442\u0432\u0430\u0440\u0430 \u0441\u0435 \u0443 \u043d\u043e\u0432\u043e\u043c \u0458\u0435\u0437\u0438\u0447\u043a\u0443)\"><img loading=\"lazy\" decoding=\"async\" width=\"32\" height=\"32\" class=\"wp-image-431\" style=\"width: 32px;\" src=\"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2019\/09\/pdf.png\" alt=\"\"><\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Policy and Legal Advice Centre (PLAC II) Through the project Policy and Legal Advice Centre (PLAC II),&nbsp;the European Union supports and assists Serbia in improving concordance between the national legislation and the EU acquis, as well as the implementation of legal acts, and enhancing capacities of relevant institutions to successfully carry out accession negotiations. The [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"<!-- wp:heading {\"align\":\"center\",\"level\":4} -->\n<h4 class=\"has-text-align-center\">Policy and Legal Advice Centre (PLAC II)<\/h4>\n<!-- \/wp:heading -->\n\n<!-- wp:image {\"align\":\"right\",\"id\":6010,\"sizeSlug\":\"large\"} -->\n<div class=\"wp-block-image\"><figure class=\"alignright size-large\"><img src=\"http:\/\/www.srbatom.gov.rs\/srbatomm\/wp-content\/uploads\/2020\/01\/Plac-II-1.jpg\" alt=\"\" class=\"wp-image-6010\"\/><\/figure><\/div>\n<!-- \/wp:image -->\n\n<!-- wp:paragraph -->\n<p>Through the project <strong>Policy and Legal\nAdvice Centre<\/strong> <strong>(PLAC II),<\/strong>&nbsp;the European Union supports\nand assists Serbia in improving concordance between the national legislation\nand the EU acquis, as well as the implementation of legal acts, and enhancing capacities of relevant institutions to successfully\ncarry out accession negotiations. The main beneficiaries are the Ministry of European Integration and the Negotiating Team for Accession of the Republic of\nSerbia to the European Union. Other beneficiaries are ministries and\ninstitutions responsible for the harmonising legislation in specific areas.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Within <strong>Chapter 15 \u2013 Energy<\/strong>, 9\nproject activities were implemented in the period between June 2016 and\nDecember 2018 whose beneficiary was Serbian Radiation Protection and Nuclear\nSafety Agency, either independently or together with other ministries.<\/p>\n<!-- \/wp:paragraph -->","_et_gb_content_width":"","ngg_post_thumbnail":0,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-6618","post","type-post","status-publish","format-standard","hentry","category-17"],"_links":{"self":[{"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/posts\/6618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/comments?post=6618"}],"version-history":[{"count":33,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/posts\/6618\/revisions"}],"predecessor-version":[{"id":10692,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/posts\/6618\/revisions\/10692"}],"wp:attachment":[{"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/media?parent=6618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/categories?post=6618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.srbatom.gov.rs\/srbatomm\/wp-json\/wp\/v2\/tags?post=6618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}